
◆ Product introduction ◆
?It integrates mud drilling, air drilling and foam drilling, and is equipped with complete air drilling equipment and other geothermal well testing equipment to meet the requirements of multi-mode geothermal well drilling process;
?It can realize the step-by-step guide rail sliding cluster well, and the mast hydraulic cylinder can be moved quickly;
?The mast and substructure can rise by multi-stage hydraulic cylinder, which can be operated remotely;
?Equipped with automatic pipe handling system (PRS), power elevators, iron roughneck and other automation equipment to reduce work intensity.
?Equipped with ahigh-voltage room, so the drilling rig can obtain electricity from the industrial grid.
◆ Technical parameter ◆
1500HP | Product parameters |
Rig model | ZJ50/3500D |
Voltage/ Frequency | 600V/380V/50Hz |
Ambient temperature | 0℃~+50℃ |
Drilling depth | 4-1/2” DP 3500~5000m 5” DP 2800~4500m |
Max. Static Hook Load | 3500kN |
Crown Sheave #& Travelling Sheave # | 6×7 |
Numbers of effective travelling lines | 12 |
Wireline Diameter | φ35mm(1-3/8”) |
Opening Diameter of Rotary Table | 952.5mm(37.5”) |
Max. DW Input Power | 1500hp |
Max. DW Fastline pull | 425kN |
Power of Single Mud Pump X Qty. | 1600hp×3 |
Mast type and Clear height of Mast | “K” 45m |
Mast Max. Static Hook Load | 3500kN |
Substructure type and Substructure Height | Slingshot 9.68m(Include steel mat and guide rail) |
Rotary beam Max. static load | 3500kN |
Air control system Max. working pressure | 1MPa |
Standpipe pressure | 35MPa |
Total Volume of Mud Tank | 422m3 |
Electric Drive | AC-SCR-DC |
Power system | Main generator set and Qty.:(CAT3512B+SR4B)×4 Auxiliary generator set and Qty.:(C 15)×1 |